星空网页版星空网页版
Technical Services
Committed to providing one-stop solutions for our customers
After-Sales Service
  • Principle
    Principle
    Customer satisfaction as the first principle
    Quick response
    Fast problem solving
  • After-sales service efficiency
    After-sales service efficiency
    Customer Feedback 30min Response
    Solution 120min Issued
    On-site support 6-12 hours
  • After-sales service commitment
    After-sales service commitment
    One year warranty on electronic components, one to three years warranty on the body
    Lifetime warranty
    Except for man-made reasons
  • After-sales team strength
    After-sales team strength
    Number of service teams 10+ Changchun, Wuhan, Chongqing, Changsha, Guangzhou, etc.
    Resident after-sales personnel and spare parts in key regions
    Technical support
    Free training
Technological Innovation
星空网页版
  • Patented locking technology
    One locking guarantee: safety platform; two locking guarantee: reset spring, up to 10 times the load of the locking force of the double air-break insurance structure
  • Patented drip-free fluid connectors
    Multi-energy: gas and liquid patented drip-free design, extremely high stability, breaking foreign monopolies
  • Cat3 safety rated electrical features
    One generation ahead of its peers, the quick-change control safety system performance level d category3 is T?V certified.
  • Autonomous high insertion and extraction life probes
    High lifespan: max1 million times; multiple types: high and low voltage, strong and weak power, network, vision, servo signal...
Service Hotline
Dear customer, Thank you very much for choosing Qiaotian products and services. After receiving the feedback of the problem, we will deal with it and contact you as soon as possible.
星空网页版
After-sales Enquiry and Complaint Hotline:400-1033-880
  • 星空网页版
    Product issues or optimisation suggestions
  • 星空网页版
    After-sales problem scheduling WeChat
  • 星空网页版
    Customer Satisfaction Survey
FAQ
  • QStandard unlocking procedure?
    1. Feed compressed air through Channel U to unlock the unit
    2. Lift positioning flange to separate from fixed locking unit
    3. Remove workpiece and stop air supply to reset locking structure
    1. Feed compressed air through Channel U to unlock the unit
    2. Lift positioning flange to separate from fixed locking unit
    3. Remove workpiece and stop air supply to reset locking structure
    星空网页版星空网页版
  • QContinuous air supply needed after full locking?
    No need. With pure mechanical spring locking design, stable clamping force is maintained even after air supply is cut off. Air supply is only required for unlocking or pressure boosting locking.
    No need. With pure mechanical spring locking design, stable clamping force is maintained even after air supply is cut off. Air supply is only required for unlocking or pressure boosting locking.
    星空网页版星空网页版
  • QSpecification of air channel ports?
    Both unlocking port U and boosting port L adopt G1/4 threaded holes.
    Both unlocking port U and boosting port L adopt G1/4 threaded holes.
    星空网页版星空网页版
  • QPre-installation preparations?
    Reserve mounting holes on installation surfaces of workstations and workpieces; thoroughly clean all fitting surfaces; prepare Dacromet bolts, cylindrical pins, torque wrenches and other tools.
    Reserve mounting holes on installation surfaces of workstations and workpieces; thoroughly clean all fitting surfaces; prepare Dacromet bolts, cylindrical pins, torque wrenches and other tools.
    星空网页版星空网页版
  • QInstallation steps for fixed locking units?
    Press cylindrical pins into reserved holes, align and place locking units, fasten with bolts and tighten according to specified torque values.
    Press cylindrical pins into reserved holes, align and place locking units, fasten with bolts and tighten according to specified torque values.
    星空网页版星空网页版
  • QInstallation steps for movable positioning flanges?
    Embed locating pins into workpiece mounting holes, fit positioning flanges in place, fix workpieces onto flanges and fasten bolts with standard torque.
    Embed locating pins into workpiece mounting holes, fit positioning flanges in place, fix workpieces onto flanges and fasten bolts with standard torque.
    星空网页版星空网页版
  • QNecessity of thread locker during bolt fastening?
    Yes. Thread locker is mandatory to prevent loose connection caused by vibration. Loctite 242 is highly recommended.
    Yes. Thread locker is mandatory to prevent loose connection caused by vibration. Loctite 242 is highly recommended.
    星空网页版星空网页版
  • QFlatness requirement for mounting surfaces?
    Mounting surfaces shall be kept as horizontal as possible to ensure uniform force bearing and accurate positioning performance.
    Mounting surfaces shall be kept as horizontal as possible to ensure uniform force bearing and accurate positioning performance.
    星空网页版星空网页版
12345 GO
Submitted successfully
make certain
Shanghai Qiaotian Intelligent Equipment Co.,Ltd
Address:Building 4, No. 55, Bixi Road, Minhang District, Shanghai, China
Business Consultancy:400-105-3088
After-Sales Support:400-103-3880
Contact Us:021-67105330
Zhejiang Qiaotian Intelligent Equipment Co.,Ltd
Address:North Side, 1st Floor, Factory Building 6, No.1 Weizhong Road, Jiashan County, Jiaxing City, Zhejiang Province, China
WeChat Official Account
WeChat Official Account
WeChat Channel
WeChat Channel
Copyright ? 2026 Shanghai Qiaotian All Rights Reserved.Shanghai ICP No. 16054250  SiteMap